Abstract
I am working on a new open source project named Riviera. The purpose of Riviera is to be a database versioning source code management tool. Riviera is a Java based implementation of the philosophy and practice of database version control written about by K. Scott Allen. But before Riviera can manage changing database versions, it first must know how those numbers are going to change. The purpose of this post is to define a clear strategy for understanding how version numbers change throughout the software development life cycle.Numbers
Versions will consist of 4 integers separated by dots with an optional dash qualifier at the end. The format for a version number isA.B.C.D[-QUALIFIER]
. Let’s take a look at what each of these numbers mean.A
This represents a major version. This number is used by a project manager to track releases. How and when this number changes is up to the project. Most like to change this number when a significant change is made to the project. Others like to change this number on a yearly basis. Determine how you want to change this number and stay consistent. Major versions can’t get to production without planned releases, which is what’s next,B
.B
This represents a planned release of the major version. This value increments every planned release.A.B
together are critical for project managers to plan, estimate, and track features in releases.NOTE Planning releases? What about Scrum? What about development teams determining what to work on each sprint, scrum masters, and no project managers? Well, if you are working in an environment like this, congratulations! Now back to reality :)Suppose a new project is spinning up. Project managers start planning for release “1.0” - which is the 1st planned release
0
of major version 1
. This release will include features f1, f2, & f3. While developers are working on “1.0”, project managers can start planning for release “1.1” - which is the 2nd planned release
1
of major version 1
. This release will include features f4 & f5.And so planning continues following this pattern. The scope of features for
A.B
is determined and the development team works on them. This planning works great until a bug is found in production. To get emergency bug fixes, C
is needed. C
This represents an emergency bug fix of a planned release. Recall that a planned release is represented byA.B
. An emergency bug fix of A.B
is represented by A.B.C
. A.B.C
together are critical for project managers to plan, estimate, and track bug fixes.If a bug is found in “1.3”, and must be fixed in production immediately, the 1st bug fix of “1.3” will be “1.3.1”. Once “1.3.1” goes to production, the
C
version number keeps incrementing as more emergency bug fixes need to be made:- “1.3.1” – 1st emergency bug fix of “1.3”
- “1.3.2” – 2nd emergency bug fix of “1.3”
- “1.3.3” – 3rd emergency bug fix of “1.3”
- “1.3.4” – 4th emergency bug fix of “1.3”
- …
D
makes sure builds can happen. Let’s take a look at D
next. D
This represents an incremental build number. This number is typically manged by some automated build system (Maven) and is used for internal purposes only.The build number tracks the number of builds made of a planned release or an emergency bug fix. Let’s take a look at each of these.
Incremental build of a planned release.
Suppose the development team is working on planned release “1.3”. As features are finished, builds are made for testing. Each build increments theD
value.- 1.3.0.0 – 1st build of planned release “1.3”
- 1.3.0.1
- 1.3.0.2
- 1.3.0.3
- 1.3.0.4
- …
Incremental build of emergency bug fix.
Suppose the development team is working on emergency bug fix “1.3.1”. As the bugs are fixed, builds are made for testing. Each build increments theD
value.- 1.3.1.0 – 1st build of emergency bug fix “1.3.1”
- 1.3.1.1
- 1.3.1.2
- 1.3.1.3
- …
[-QUALIFIER]
This is an optional part of a version number. Maven uses-SNAPSHOT
to represent non-official builds. GIT, Subversion, CVS, etc.
Now that the format of the version number has been defined, let’s consider the effects on the change control system (GIT, Subversion, CVS, etc.). To do this, we’ll follow a hypothetical development time line. As you read through the time line, reference figure 1 to see how the trunk, branches, and tags change over time.Time Line
- Planning for the “1.0” release is complete. Development starts. Trunk is at 1.0.0.0 (a).
- “1.0” features completed. A build is made for testing. Tag 1.0.0.0 is created from trunk. Trunk becomes 1.0.0.1 (b)
- “1.0” features completed. A build is made for testing. Tag 1.0.0.1 is created from trunk. Trunk becomes 1.0.0.2 (c)
- “1.0” features completed. A build is made for testing. Tag 1.0.0.2 is created from trunk. Trunk becomes 1.0.0.3 (d)
- Planning for “1.1” release is complete. Branch 1.0.0 is created for ongoing “1.0” development. Trunk becomes 1.1.0.0 and “1.1” development starts on trunk. (e)
- “1.0” features completed. A build is made for testing. Tag 1.0.0.3 is created from branch. Branch becomes 1.0.0.4. Changes from branch merged into trunk. (f)
- “1.1” features complete. A build is made for testing. Tag 1.1.0.0 is created from trunk. Trunk becomes 1.1.0.1 (g)
- “1.0” features completed. A build is made for testing. Tag 1.0.0.4 is created from branch. Branch becomes 1.0.0.5. Changes from branch merged into trunk. (h)
- “1.1” features complete. A build is made for testing. Tag 1.1.0.1 is created from trunk. Trunk becomes 1.1.0.2 (i)
- “1.0” FINISHED. Build 1.0.0.4 goes to production (j)
- “1.1” features complete. A build is made for testing. Tag 1.1.0.2 is created from trunk. Trunk becomes 1.1.0.3 (k)
- “1.1” features complete. A build is made for testing. Tag 1.1.0.3 is created from trunk. Trunk becomes 1.1.0.4 (l)
- “1.1” features complete. A build is made for testing. Tag 1.1.0.4 is created from trunk. Trunk becomes 1.1.0.5 (m)
- “1.0” EMERGENCY BUG FIX. Create branch from 1.0.0.4 tag (the build in production). Branch becomes 1.0.1.0 (n)
- “1.0.1” EMERGENCY BUG FIX complete. A build is made for testing. Tag 1.0.1.0 is created from branch. Branch becomes 1.0.1.1. Changes in branch merged into trunk (o)
- “1.0.1” EMERGENCY BUG FIX complete. A build is made for testing. Tag 1.0.1.1 is created from branch. Branch becomes 1.0.1.2. Changes in branch merged into trunk (p)
- “1.1” features complete. A build is made for testing. Tag 1.1.0.5 is created from trunk. Trunk becomes 1.1.0.6 (q)
- “1.0.1” EMERGENCY BUG FIX complete. A build is made for testing. Tag 1.0.1.2 is created from branch. Branch becomes 1.0.1.3. Changes in branch merged into trunk (r)
- “1.0.1” FINISHED. Build 1.0.1.2 goes to production (s)
- And it continues…
Figure 1 - Trunk, Branches, & Tags
TRUNK
1.0.0.0------ (a)
| \
| TAG
| 1.0.0.0 (b)
|
1.0.0.1------ (b)
| \
| TAG
| 1.0.0.1 (c)
|
1.0.0.2------ (c)
| \
| TAG
| 1.0.0.2 (d)
|
1.0.0.3------ (d)
| \
| BRANCH
| 1.0.0.3------ (e)
| | \
| | TAG
| | 1.0.0.3 (f)
| |
| 1.0.0.4------ (f)
| | \
| | TAG------
| | 1.0.0.4 \ (h) (j)
| | BRANCH------
| 1.0.0.5 1.0.1.0 \ (h) (n)
| | | TAG
| - | 1.0.1.0 (o)
| |
| 1.0.1.1------ (o)
| | \
| | TAG
| | 1.0.1.1 (p)
| |
| 1.0.1.2------ (p)
| | \
| | TAG
| | 1.0.1.2 (r) (s)
| |
| 1.0.1.3 (r)
|
1.1.0.0------ (e)
| \
| TAG
| 1.1.0.0 (g)
|
1.1.0.1------ (g)
| \
| TAG
| 1.1.0.1 (i)
|
1.1.0.2------ (i)
| \
| TAG
| 1.1.0.2 (k)
|
1.1.0.3------ (k)
| \
| TAG
| 1.1.0.3 (l)
|
1.1.0.4------ (l)
| \
| TAG
| 1.1.0.4 (m)
|
1.1.0.5------ (m)
| \
| TAG
| 1.1.0.5 (q)
|
1.1.0.6 (q)
No comments:
Post a Comment